Page 4 weekly visualized progress of completion:
Item “c” Window frames and glass 70% completed – what is the completion date?
Item “e” I’m concerned with the wall painting quality without any heat.
Item “n” heating system 90% completed. How will testing be conducted without gas connection? When is the connection date for the gas?
Item “o” pressure testing of fire piping. Was GRC present for testing, and what were the results?