开始制作后3天之内 英语怎么说请高手帮我说说,“产品开始制作后的3天之内可以变更图纸”英语怎么说时间关系很复杂,我不知道

开始制作后3天之内 英语怎么说
请高手帮我说说,“产品开始制作后的3天之内可以变更图纸”英语怎么说
时间关系很复杂,我不知道怎么说.谢谢啦!
ghost341 1年前 已收到8个回答 举报

zkun 幼苗

共回答了18个问题采纳率:94.4% 举报

the drawings can be changed within 3 days after the production starts

1年前

6

虚伪的小马 幼苗

共回答了3968个问题 举报

The graphes may be changed within three days after the production.

1年前

2

MSZHUWEI 幼苗

共回答了48个问题 举报

The gragh is allowed to be changed within three days after the start of production.

1年前

1

wangyajing983 幼苗

共回答了508个问题 举报

Drawing paper can be modified in three days after products making.

1年前

1

qian3256 幼苗

共回答了393个问题 举报

The graphes are allowed to be changed just within three days after you start producing the products.

1年前

1

爱龙宝儿 幼苗

共回答了14个问题 举报

3-day changeable blueprints are being started producing.

1年前

0

无悔之剑 幼苗

共回答了48个问题 举报

The drawings can be changed within three days after the start of production.

1年前

0

磨豆豆 幼苗

共回答了635个问题 举报

within the 3 days after the start of production.

1年前

0
可能相似的问题
Copyright © 2024 YULUCN.COM - 雨露学习互助 - 24 q. 0.040 s. - webmaster@yulucn.com